RFx of the Day:
U.S. Department of Defense
From the RFP: “The 115th Fighter Wing at Dane County Regional Airport -Truax Field, Madison, WI intends to issue a Request for Proposal to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to construct an F-35 Flight Simulator Building.”
In addition to building a new facility to house the flight simulators, contractors will be required to demolish the old 4,646 square-foot facility and may be required to safely remove small amounts of asbestos.
“Strict adherence to construction plans and specifications is absolutely necessary to ensure Lockheed Martin simulators are capable of being installed.”
Does your company specialize in large-scale construction with services such as:
- Construction of a facility with multiple independent mechanical plumbing, waste water, electrical, and technology systems?
- Security hardware including magnetic switches, cameras, and motion sensors?
- Existing building demolition?
If so, you can find out more at https://beta.sam.gov/opp/89b7332490d4408c86f093cb8bffafc6/view?keywords=&sort=-modifiedDate&index=opp&is_active=true&page=1. Don’t delay. The deadline for submission is 10/01/2020 at 3:00pm CDT.
Photo by Shaun Darwood on Unsplash
FULL DETAILS
REFERENCE
Solicitation ID W50S9F-20-R-0001
DEADLINES
October 1, 2020